Case study · UK agency rescue

From stalled delivery to go-live in four weeks.

A UK digital agency brought me into three premium client accounts that were slipping at the same time. I diagnosed where delivery was actually stuck, documented the recovery plan in three days, embedded a delivery pod and took client-facing ownership under the agency's name.

  1. Stalled delivery
  2. Recovery system
  3. Live in 4 weeks
D01-03W01W02W03W04W05-08GO-LIVE
3 daysto documented plan
4 weeksto go-live
3accounts retained
ClientUK digital agency
EngagementWhite-label rescue
RoleTPM and delivery lead
Team15+ in-house developers
Support4 weeks post-launch

02 / The situation

The agency had capacity. It didn't have a delivery system it could trust.

The agency had 15+ developers and a healthy book of premium retained clients, but projects were not moving at the pace the contracts assumed. Phase 1 remained unfinished, timelines kept stretching, and clients had started questioning delivery in calls.

Three of the agency's most important accounts were at risk at the same time: a WordPress service website, a delayed Shopify launch, and a B2B social programme without the tooling or content pipeline it needed. The immediate problem was not technical debt. It was trust running out across three relationships at once.

Risk signals

  • 01Three premium retainers were at real risk of churn.
  • 02The fashion brand launch was on hold because the Shopify store was not ready.
  • 03Leadership could not give clients dates it trusted.
  • 04The new COO needed a credible delivery turnaround, quickly.

03 / Diagnosis

With 15+ developers already available, more headcount wasn't the first answer.

The bottleneck was structural. Output was uneven, there was no current-state assessment or milestone plan, Phase 1 had no agreed definition of done, and nobody owned the client conversation end to end.

01

Uneven output

A subset of seats was consuming timeline without producing enough shippable work.

02

No documented route

There was no current-state assessment, milestone plan or named deliverable sequence.

03

No definition of done

Phase 1 could continue indefinitely because completion had not been made verifiable.

04

No single accountable owner

Updates were inconsistent and client confidence kept dropping.

04 / The recovery system

The first three days were for clarity, not code.

I started by turning an open-ended delivery problem into a sequence that developers, leadership and clients could all understand. Execution began on day four.

  1. 01Day 1

    Diagnose actual output

    Review active work against real output and identify where efficiency was being lost.

  2. 02Days 1 to 3

    Document current state and goal state

    Write down what existed, what “done” meant, the execution route, dependencies and risks.

  3. 03Day 3

    Take delivery ownership

    Control scope, sequence and priorities instead of advising from the outside.

  4. 04Day 3

    Embed a proven pod

    Bring development, design, BA, QA and content capacity that could execute immediately.

  5. 05Ongoing

    Own the client rhythm

    Run communication, demos, approvals and reporting under the agency's name.

  6. 06Weekly

    Make progress visible

    Ship client-visible evidence every week instead of relying on reassurance.

05 / Three workstreams

One delivery system. Three different client problems.

I was brought in for three of the agency's most important accounts. Each had a different constraint, so the execution plan changed by workstream while the delivery discipline stayed consistent.

01 / WordPress + social

Local UK pest control business

A service site with 100+ service types and no local visibility.

ProblemA service website with 100+ distinct service types and effectively no local visibility.

What changedReorganised the service architecture, built page by page against approved designs, added commerce and booking after core approval, established local-search fundamentals, and aligned Facebook and Instagram management with the site.

02 / Ecommerce

Women's fashion brand

A launch blocked by an unfinished Shopify store.

ProblemThe brand launch was blocked because the Shopify store was not ready.

What changedDocumented the minimum launch-ready state, prioritised collection, product and checkout journeys first, and used the same milestone discipline to clear the blocker holding the launch.

03 / Paid + organic social

B2B business services

Social activity without a repeatable pipeline.

ProblemFacebook, Instagram and TikTok activity was running without the research, tooling or content pipeline needed to make it repeatable.

What changedIntroduced planning, scheduling and reporting tooling, had the BA define the ICP, built a copy and design content pipeline, and delivered a one-month social calendar for approval.

06 / Execution timeline

Progress had to become visible every week.

Not more status updates. Actual pages, functionality, approvals and a clear route to launch.

  1. Days 01 to 03

    Diagnose and document

    Resource review, current and goal state, project plan, milestones, risk assessment and pod onboarding.

  2. Week 01

    Core build and design approval

    Major pages built by the end of the week and the client approved the design.

  3. Week 02

    Secondary pages, commerce and booking

    Built the 100+ page service structure, ecommerce and booking, and completed the WordPress build.

  4. Week 03

    QA

    Functional, responsive, forms, checkout and booking QA. Defects logged and fixed before sign-off.

  5. Week 04

    UAT and go-live

    Client walkthrough, formal UAT, feedback resolved inside the week, then launch.

  6. Weeks 05 to 08

    Stabilise and hand over

    Four weeks of post-launch support, monitoring, issue resolution and independent handover.

07 / Results

The only measure that mattered.

All three clients stayed.

3Client accounts retained
3 daysTo a documented plan
To go-live4 weeks
4 weeksPost-launch support

08 / Partner proof

“When I stepped in, three of our biggest accounts were slipping and I could not give anyone a date I trusted. Faraz told us honestly where delivery was actually stuck, had a documented plan inside three days, and we were shipping again within the month. He ran it all under our name so cleanly that our clients only noticed one thing, that the work suddenly started arriving on time.”

COO / UK digital agencyName withheld / White-label engagement

09 / What this demonstrates

More developers weren't the answer. Clearer ownership was.

With 15+ developers already available, the turnaround came from making delivery explicit: what was blocked, what “done” meant, who owned each risk, what would ship next, and who was accountable to the client.

01

Clarity before velocity

Three days spent documenting the problem made the four-week execution possible.

02

Trust rebuilt by evidence

A client-visible win in week 1 changed the tone of the engagement more than another status update could.

03

White-label can still mean senior ownership

The agency kept the relationship while delivery, demos, approvals and reporting were handled behind its brand.

Services used on this project

The engagement combined four services.

Next case study

Re-architecting a 30 GB WordPress platform without rebuilding it.

Read the case study

Next step

Have a build that needs stronger delivery ownership?

Send the brief, designs or rough client notes. I'll help turn what you have into the clearest next step.

Send a project brief Book a 15-min fit call

NDA-friendly · US + UK overlap · White-label by default